Career Path

All seniors culminate their undergraduate educational experience with a capstone course called Final Project. This course provides students with firsthand experience at solving real-world problems in a team of three environment. Student teams select a major design experience from a company, not-for-profit organization, or be part of faculty research and exploit all available resources in order to develop a solution for the project client or faculty. Final Project is a unique opportunity for industries to partner and interact with IE undergraduates and is truly a win-win collaboration for both students and industry partners.

International Partners:

PT. Astra Daihatsu Motor:

  • The number of the used server, waiting time, and total service cost, from the observation, the waiting time rate is about 11.60%
  • The cost and benefit production planning system of procurement program
  • Comparison between Junbiki method and Kanban cycle for the Part Bumper to increase the efficiency and productivity
  • The Milk-Run system to increase the delivery efficiency of part from supplier to the assy plant
  • Implementation of Reverse Engineering for the accessories product

PT. Astra Honda Motor:
The market claim of broken cover handle rear KVL type, using the DMAIC Six Sigma method

PT. Toyota Astra Motor:

  • The Six Sigma method to increase the IT Service quality
  • QCC method to repair the way of filling the automatic oil transmission in terms of eliminating the back pain risk to technicians in Sudirman workshop

PT. Toyota Motor Manufacturing:

  • The construction design time of dies pattern
  • Green Procurement Approach using the K-Means Genetic Algorithm
  • Reduce the lead time manufacturing process of draw process die

PT. Astrido Toyota Pondok Gede:
The booking customer satisfaction with fixing the customer acceptance system

PT. Garuda Indonesia:
Quality Management System Design in aiming ISO 9001:2008 using related clausus to increase customer satisfaction

PT. Bakrie Building Industries:

  • Control product quality Versaboard using the DMAIC method
  • 5S work principle in fabrication I to increase the efficiency of production time

PT. United Tractor:

  • Construction of steel shelf and manage the storage layout of steel sheet
  • Inventory policy of operational plan in 2009 using the simulation method for minimizing total inventory cost and days of inventory
  • Optimization Spare Parts distribution cost
  • Number of inventory based on Hour Meter calculation to increase the availability filter of heavy equipment spare parts

PT. Schenider Electric Indonesia
The 5 Maslow Needs Priority Order in order to improve service reliability in MC SET assembly process

National Partners:

PT. Sharp Electronics Indonesia:
Product Development of Televison 17 inch based on User Satisfaction Analysis using Quality Function Deployment Method

PT. Jasa Marga. Tbk:
Product Development of Payment and Navigation Tools using Fuzzy QFD Analysis

PT. Gramedia Printing Unit
Quality Improvement Analysis in Color prints using DMAIC Method

PT. Mulia Knitting Factory:
Quality Improvement Analysis in Knitting Division Production Process using Dynamic System Simulation

PT. Omni Kemas Industry:
Preventive Maintenance Action and Demand Forecasting in order to maximize profit based on Linear Programming Method in Department Injection

PT. Quantum Tosan Internasional:
Improvement of Layout and the Reduction of Overtime Labor Day using the concept of Lean thinking

PT. Indocitra Widhitama Industries:
Work System using Methods-Time Measurement Approach in AC CORD assembly lines

PT. Swarna Cemerlang Coating:
Factory Layout Analysis with Machine Scheduling and Measuring the level of work risk

PT. Sucaco Tbk:
Indoor Cable Quality Improvement Analysis using Taguchi Method and Machine Maintenance using Preventive Maintenance

PT. Indah Varia Eka Selaras:
Design Improvement of Drip Chamber Product System Molding using Moldflow Plastic Advisers Software

Plaza Semanggi and Taman Anggrek Mall Parking Lot:
Product Development of Navigation Tools and Parking System for Service Improvement and Customer Luxury

Steak House
A Business Strategy in overcoming the Restaurant Industry competitiveness